2014 Projects

2014 Paving Projects

1st Avenue (Washington - Van Buren)
13th Avenue (Bertelsen - Commerce)
13th Avenue (Washington to Garfield)
43rd Avenue (North Shasta - Dillard)
46th Avenue (Donald - Willamette)
Broadway (Mill - Pearl)
Coburg Road (Ferry Street Bridge – 50 feet south of EWEB off-ramp)
Donald Street (46th - Fox Hollow)
Firland (Spring - Agate)
Goodpasture Loop Road
Interior Street (north end of cul-de-sac – south end of improved section)
Madison Street (1st - 8th)
Marshall (Hughes - Echo Hollow)
Monroe Street (1st - Blair)
- Monroe Street Jan. 23 Meeting Notes 
- Monroe Street Presentation # 1 (Large file)
- Monroe Street Presentation #2 (Large file)
- Monroe Street April 1 Meeting Notes
Olive Street (11th - 13th)
Roosevelt Boulevard (Danebo - Terry)
Shasta Loop (Spring Boulevard- 43rd)
Slurry Seals
LTD’s West Eugene EmX Project
Goodpasture Island Road Bridge

View 2014 Paving Projects in a larger map


Maintenance Overlays

  • East Irwin (Barger to North Way)
  • East Irwin (North Way to end; currently gravel)
  • Dewey (Barger to Cody)
  • Devos (Barger to start of previous overlay
  • Ellsworth (Royal to 160 feet north of Royal)

Pedestrian-Bicycle Projects

2014 PBM Pedestrian and Bicycle Improvements

Safe Routes to School

South Bank Path (Knickerbocker Bridge - Franklin)


Park Projects

Current Parks and Open Space projects

Amazon Park Renovation

Spencer Butte Summit Trail Renovation


Stormwater/Natural Area Projects

Amazon Creek Stabilization Project

Coyote Prairie Swale Restoration

Drywell elimination (Anderson Area) 

Various Stormwater Repairs

Water Quality Facilities, Willamette River Basin, A-3 Basin

Hatton Avenue stormwater extension

Amazon Creek Rehabilitation (24th to Fairgrounds; study phase)